A highly specified application with nuclear material handling at an ExxonMobil facility.
A challenging project that forged a long term relationship.
ExxonMobil is the world’s largest publicly traded international oil and gas company. They hold an industry-leading inventory of global oil and gas resources, are the world’s largest refiner and marketer of petroleum products, and their chemical company ranks among the world’s largest. Through the application of science and innovation they find better, safer and cleaner ways to deliver the energy the world needs.
ExxonMobil’s Joliet, Illinois Refinery is a key supplier of refined petroleum products to the Midwest, a leader in energy efficiency among U.S. refineries, and a prime example of a facility that uses new technologies to stay ahead of the industry curve. Recently, they purchased and installed the Tracerco Profiler™, which is a nucleonic instrument used to measure vertical distribution of oil, gas, foam, emulsion, water and sand in real time at high resolution. This patented instrument is a ‘window’ into a vessel, which enables an operator to improve production throughput, reduce the number of unscheduled shutdowns and achieve significant cost savings.
The main component in this system is a radioactive isotope, which generates large amounts of heat during normal operation – this condition requires an integrated, fail-safe cooling system to operate. Since the Profiler doesn’t include this cooling system, ExxonMobil called upon their trusted engineering and consulting partner, Ambitech, to find a company who could develop one for them.
Ambitech wasn’t simply looking to place an order for a piece of equipment; they were looking for a trusted partner who could deliver a custom solution on time and with no surprises for one of their most-significant clients. After an exhaustive search they found Fluid Cooling Systems (FCS).
The level of detail and thorough preparedness of ExxonMobil’s planning and engineering team was impressive. This helped FCS to hit the ground running, which was essential in this situation with a tight timeline and a high-profile client. After passing the extensive vetting process, digesting the specifications, passing a shop inspection, conducting a site visit and adhering to a host of other vetting procedures, FCS was ready to start in earnest.
From the onset, every member of the FCS team had to become intimately aware of all project requirements – this meant having to understand the documentation inside and out. Doing so helped make production and inspections more efficient since everyone was working toward shared goals and understood all requirement details.
FCS documented every process required to complete this project. In several instances, new processes were developed to meet ExxonMobil’s specifications. These were all presented to ExxonMobil and Ambitech who reviewed, commented and approved each process.
Since frequent third-party inspections were part of the requirements, the FCS team decided to take advantage of them. They forged a great working relationship with the inspector, who was tough but fair. FCS treated inspections as an opportunity to get one step closer to delivering the final product.
Construction was time-consuming, mainly because of the stringent specifications and frequent inspections. However, working through a thorough process every step of the way helped ensure the end product was problem-free and could be shipped to the job site as specified, without any quality concerns.
The Outcome
The custom cooling system shipped within the agreed-upon timeframe with virtually no issues along the way. As of 14 months after start-up, there have been no warranty calls.
This project was a big milestone for FSC because it was their first oil and gas project and helped them diversify into a market that’s hard to penetrate. It also provided the opportunity to formalize long-held processes and establish new ones that will benefit future projects and help them strive for continued excellence.
FCS was able to forge deep relationships with key stakeholders. They adhered to strict requirements and proved they are capable of following detailed specs and delivering as promised. It is not lost on them how fortunate they are to have been considered for this project. And, they proved to be more than up to the task of providing a first-of-it’s-kind solution for one of the world’s largest and most recognized companies.